Section 75622.  


Latest version.
  • Upon the filing of a protest, the board shall hold a hearing, at which time the total amount of the water production and the ground water charge thereon shall be determined. Such determination shall be conclusive if based upon substantial evidence.

(Added by Stats. 1965, Ch. 75.)