California Law (Last Updated: March 4, 2014) |
Water Code - WAT |
Division 21. WATER CONSERVATION DISTRICTS |
Part 9. GROUND WATER CHARGE |
Chapter 3. Procedure for Levy and Collection |
ARTICLE 4. Collection |
Section 75617.
Latest version.
-
The board may, at the time of fixing the ground water charge, establish a method or methods to be used in computing the amount of water produced from a water-producing facility which is not measured by a measuring device.
Such methods may be based upon any or all or a combination of the following criteria:
(a) The size of water-producing facility discharge opening.
(b) The area served by the water-producing facility.
(c) The number of persons served by the water-producing facility.
(d) The use of land served by the water-producing facility.
(e) The crops grown on land served by the water-producing facility.
(f) Any other criteria which may be used to determine with reasonable accuracy the amount of water produced from a water-producing facility.
(Added by Stats. 1965, Ch. 75.)