California Law (Last Updated: March 4, 2014) |
Public Utilities Code - PUC |
Division 1. REGULATION OF PUBLIC UTILITIES |
Part 1. PUBLIC UTILITIES ACT |
Chapter 2.3. Electrical Restructuring |
ARTICLE 6. Requirements for the Public Utilities Commission |
Section 364.
-
(a) The commission shall adopt inspection, maintenance, repair, and replacement standards for the distribution systems of investor-owned electric utilities no later than March 31, 1997. The standards, which shall be performance or prescriptive standards, or both, as appropriate, for each substantial type of distribution equipment or facility, shall provide for high quality, safe and reliable service.
(b) In setting its standards, the commission shall consider: cost, local geography and weather, applicable codes, national electric industry practices, sound engineering judgment, and experience. The commission shall also adopt standards for operation, reliability, and safety during periods of emergency and disaster. The commission shall require each utility to report annually on its compliance with the standards. That report shall be made available to the public.
(c) The commission shall conduct a review to determine whether the standards prescribed in this section have been met. If the commission finds that the standards have not been met, the commission may order appropriate sanctions, including penalties in the form of rate reductions or monetary fines. The review shall be performed after every major outage. Any money collected pursuant to this subdivision shall be used to offset funding for the California Alternative Rates for Energy Program.