Section 6805.  


Latest version.
  • The procurement process for the design-build projects shall progress as follows:

    (a) The transportation entity shall prepare a set of documents setting forth the scope and estimated price of the project. The documents may include, but need not be limited to, the size, type, and desired design character of the project, performance specifications covering the quality of materials, equipment, workmanship, preliminary plans, and any other information deemed necessary to describe adequately the transportation entity's needs. The performance specifications and any plans shall be prepared by a design professional who is duly licensed and registered in California.

    (b) Based on the documents prepared as described in subdivision (a), the transportation entity shall prepare a request for proposals that invites interested parties to submit competitive sealed proposals in the manner prescribed by the transportation entity. The request for proposals shall include, but need not be limited to, the following elements:

    (1) Identification of the basic scope and needs of the project or contract, the estimated cost of the project, the methodology that will be used by the transportation entity to evaluate proposals, whether the contract will be awarded on the basis of the lowest responsible bid or on best value, and any other information deemed necessary by the transportation entity to inform interested parties of the contracting opportunity.

    (2) Significant factors that the transportation entity reasonably expects to consider in evaluating proposals, including, but not limited to, cost or price and all nonprice-related factors.

    (3) The relative importance or the weight assigned to each of the factors identified in the request for proposals.

    (4) For transportation entities authorized to utilize best value as a selection method, the transportation entity reserves the right to request proposal revisions and hold discussions and negotiations with responsive bidders and shall so specify in the request for proposals and shall publish separately or incorporate into the request for proposals applicable rules and procedures to be observed by the transportation entity to ensure that any discussions or negotiations are conducted in good faith.

    (c) Based on the documents prepared under subdivision (a), the transportation entity shall prepare and issue a request for qualifications in order to prequalify the design-build entities whose proposals shall be evaluated for final selection. The request for qualifications shall include, but need not be limited to, the following elements:

    (1) Identification of the basic scope and needs of the project or contract, the expected cost range, the methodology that will be used by the transportation entity to evaluate proposals, the procedure for final selection of the design-build entity, and any other information deemed necessary by the transportation entity to inform interested parties of the contracting opportunity.

    (2) (A) Significant factors that the transportation entity reasonably expects to consider in evaluating qualifications, including technical design and construction expertise, skilled labor force availability, and all other nonprice-related factors.

    (B) For purposes of subparagraph (A), skilled labor force availability shall be determined by the existence of an agreement with a registered apprenticeship program, approved by the California Apprenticeship Council, that has graduated at least one apprentice in each of the preceding five years. This graduation requirement shall not apply to programs providing apprenticeship training for any craft that was first deemed by the Department of Labor and the Department of Industrial Relations to be an apprenticeable craft within the five years prior to the effective date of this article.

    (3) A standard form request for statements of qualifications prepared by the transportation entity. In preparing the standard form, the transportation entity may consult with the construction industry, the building trades and surety industry, and other public agencies interested in using the authorization provided by this chapter. The standard form shall require information including, but not limited to, all of the following:

    (A) If the design-build entity is a partnership, limited partnership, joint venture, or other association, a listing of all of the partners, general partners, or association members known at the time of statement of qualification submission who will participate in the design-build contract.

    (B) Evidence that the members of the design-build entity have completed, or demonstrated the experience, competency, capability, and capacity to complete projects of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that assures the transportation entity that the design-build entity has the capacity to complete the project.

    (C) The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.

    (D) Evidence that establishes that the design-build entity has the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.

    (E) Information concerning workers' compensation experience history and a worker safety program.

    (F) A full disclosure regarding all of the following that are applicable:

    (i) Any serious or willful violation of Part 1 (commencing with Section 6300) of Division 5 of the Labor Code or the federal Occupational Safety and Health Act of 1970 (Public Law 91-596), settled against any member of the design-build entity.

    (ii) Any debarment, disqualification, or removal from a federal, state, or local government public works project.

    (iii) Any instance where the design-build entity, or its owners, officers, or managing employees submitted a bid on a public works project and were found to be nonresponsive or were found by an awarding body not to be a responsible bidder.

    (iv) Any instance where the design-build entity, or its owners, officers, or managing employees defaulted on a construction contract.

    (v) Any violations of the Contractors' State License Law, as described in Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, including alleged violations of federal or state law regarding the payment of wages, benefits, apprenticeship requirements, or personal income tax withholding, or Federal Insurance Contribution Act (FICA) withholding requirements settled against any member of the design-build entity.

    (vi) Any bankruptcy or receivership of any member of the design-build entity, including, but not limited to, information concerning any work completed by a surety.

    (vii) Any settled adverse claims, disputes, or lawsuits between the owner of a public works project and any member of the design-build entity during the five years preceding submission of a bid under this article, in which the claim, settlement, or judgment exceeds fifty thousand dollars ($50,000). Information shall also be provided concerning any work completed by a surety during this five-year period.

    (G) If the proposed design-build entity is a partnership, limited partnership, joint-venture, or other association, a copy of the organizational documents or agreement committing to form the organization, and a statement that all general partners, joint venture members, or other association members agree to be fully liable for the performance under the design-build contract.

    (H) An acceptable safety record. A bidder's safety record shall be deemed acceptable if its experience modification rate for the most recent three-year period is an average of 1.00 or less, and its average total recordable injury/illness rate and average lost work rate for the most recent three-year period does not exceed the applicable statistical standards for its business category or if the bidder is a party to an alternative dispute resolution system as provided for in Section 3201.5 of the Labor Code.

    (4) The information required under this subdivision shall be verified under oath by the design-build entity and its members in the manner in which civil pleadings in civil actions are verified. Information required under this subdivision that is not a public record under the California Public Records Act, as described in Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code, shall not be open to public inspection.

    (d) For those projects utilizing low bid as the final selection method, the competitive bidding process shall result in lump-sum bids by the prequalified design-build entities. Awards shall be made to the lowest responsible bidder.

    (e) For those projects utilizing best value as a selection method, the design-build competition shall progress as follows:

    (1) Competitive proposals shall be evaluated by using only the criteria and selection procedures specifically identified in the request for proposals. However, the following minimum factors shall be weighted as deemed appropriate by the contracting transportation entity:

    (A) Price.

    (B) Technical design and construction expertise.

    (C) Life-cycle costs over 15 years or more.

    (2) Pursuant to subdivision (b), the transportation entity may hold discussions or negotiations with responsive bidders using the process articulated in the transportation entity's request for proposals.

    (3) When the evaluation is complete, the top three responsive bidders shall be ranked sequentially based on a determination of value provided.

    (4) The award of the contract shall be made to the responsible bidder whose proposal is determined by the transportation entity to have offered the best value to the public.

    (5) Notwithstanding any other provision of this code, upon issuance of a contract award, the transportation entity shall publicly announce its award, identifying the contractor to whom the award is made, along with a written decision supporting its contract award and stating the basis of the award. The notice of award shall also include the transportation entity's second- and third-ranked design-build entities.

    (6) The written decision supporting the transportation entity's contract award, described in paragraph (5), and the contract file shall provide sufficient information to satisfy an external audit.

(Added by Stats. 2009, 2nd Ex. Sess., Ch. 2, Sec. 3. Effective May 21, 2009. Repealed as of January 1, 2014, pursuant to Section 6813.)